Independent stage inspections at every key milestone of your new home build β Slab, Frame, Pre-Plaster, Fixing & Waterproofing, and Practical Completion. We identify non-compliances and defects while they're still accessible and fixable, protecting your investment from the foundation up.
When you're building a new home, your builder's supervisor conducts internal quality checks β but they work for the builder, not for you. An independent stage inspection at each milestone provides an unbiased, professional assessment that protects your interests and ensures every element of your build complies with engineering drawings, the NCC, and Australian Standards.
Each stage has a specific scope β here's exactly what we assess at every critical milestone of your build.
Conducted before your concrete slab is poured, this inspection verifies that all structural elements are in place and correctly positioned β problems identified now are simple to fix; after the pour, they may require expensive remediation.
Your timber or steel frame is fully exposed at this stage, making it the ideal time to verify structural compliance. Once cladding and plasterboard go on, many frame elements are permanently inaccessible.
The last opportunity to inspect services rough-in, insulation, and frame elements before they're permanently sealed behind plasterboard. Defects identified here are far cheaper to rectify than post-plaster.
With plasterboard in place and fit-out underway, this inspection focuses on waterproofing in wet areas β one of the most critical and commonly deficient elements in new residential construction across Australia.
The final stage inspection β a thorough assessment of the completed home before you accept the keys. Your builder is legally responsible for rectifying all defects identified before practical completion.
Book all five stage inspections as a package for complete, independent oversight of your entire build β from slab to handover. This is the most comprehensive way to protect your new home investment.
Our stage inspection service is consistent and thorough across every milestone β here's what's delivered at each inspection.
Before attending each stage, we review your engineering drawings and approved plans relevant to that milestone. This allows us to inspect not just workmanship quality, but specifically whether the build matches the approved structural design β which is the most critical aspect of any stage inspection.
Our qualified inspector attends site and conducts a systematic, scope-specific inspection of all elements relevant to that stage. Every non-conformance, defect, and departure from drawings is identified, photographed, and documented. You are welcome to attend any stage inspection.
A stage-specific inspection report is delivered to your inbox within 24 hours of inspection β every finding photographed, clearly described, and cross-referenced to engineering drawings or the NCC as applicable. Formatted to present directly to your builder as a formal defect notice.
If your builder disputes findings or needs clarification, we provide professional liaison on your behalf β explaining the specific engineering or NCC reference supporting each finding. A documented, professional inspection report carries significant weight in any rectification discussion.
For any stage where significant defects are identified, we offer a re-inspection to confirm all items have been properly rectified before construction progresses to the next stage. This ensures defects don't get covered up and carried through the rest of the build.
Building timelines change β we understand that. You can book individual stages as you need them, or package all five stages upfront. We work around your builder's progress and provide priority scheduling so inspections never delay your construction programme.
Simple to arrange, flexible to fit your build timeline, and designed to give you maximum protection at every milestone.
Contact us with your build details and expected construction timeline. We'll confirm which stages you need and provide pricing.
Share your engineering drawings, approved plans, and building contract. We review these before each stage to inspect against your specific design.
As construction reaches each milestone, contact us to arrange the inspection. We'll attend site within your required timeframe.
Our inspector conducts a thorough stage-specific assessment and documents all findings with photographs. You're welcome to attend.
Stage report delivered within 24 hours. Present to your builder, request rectification, and confirm before the next stage proceeds.
We conduct stage inspections for all types of new residential construction across Australia.
Building your family home? Full stage inspections give you independent oversight of every milestone β ensuring your builder delivers exactly what you've contracted for, to the standard it should be built.
Building investment properties often involves volume builders and tight margins. Independent stage inspections protect your investment and help ensure your property is built to a standard that maintains its value and rental appeal long-term.
Knock-down-rebuild projects on established sites often face unique challenges β tight boundaries, existing services, and complex site conditions. Stage inspections ensure every critical element is built correctly from the start on your existing land.
Common questions from Australians building new homes β answered clearly.
Contact us today to discuss your build timeline and book individual stages or a full package. Fast response, professional service, MonβSat 7amβ7pm.
Building a new home? Protect it from the ground up with a pre-construction termite management system β installed before your slab is poured and compliant with AS 3660.1.
Learn about Termite Management for New BuildsBook independent stage inspections at every milestone β because defects caught during construction are a fraction of the cost to fix after completion.